01

Step One

Instant acceptance of an application

To calculate the cost of a sliding structure, when making an application, you must specify the following data:

  • Length mm
  • Height mm
  • Type of construction
  • The number of panels, pcs. (if applicable)
  • Bracing type: ceiling / floor-ceiling
  • Suspension: single-roller / double-roller
  • Coating Material / Color
  • Profile color
  • Color of the ceiling guide
  • Door: single-leaf / double-leaf
  • Sound insulation, dB
  • Control: Mechanical/semi-automatic
  • Special parking requirements
  • Address of the object
Process
02

Step Two

Free blueprint

Our engineers will execute the illustration of the sliding partition without prepayment and additional requirements

Process
03

Step Three

Calculation in 1 dayy

  • The calculation process should not be underestimated, since a lot of indicators are taken into account in this issue.
  • All calculations are handled by professionals
  • Our engineers make standard calculations for
  • If the calculation is more complicated, it will take from several hours to one day
  • Customers receive a commercial offer from our company on the day of sending the application
Process
04

Step Four

Production for over 1 week

  • The average delivery time of a sliding partition or wall NORM is over 7 days, a collapsible sliding wall NORMA 100 is over 28 days
  • The process of approval of drawings and technical specifications takes 1-2 days.
  • The computation and its confirmation take from 1 to 2 days.
  • Delivery of sliding structures and their customs clearance takes about 1 week.
  • The total production time depends on the complexity of the approval process and the queue at the production site.
Process
05

Step Five

Installation in 1 day

  • 50% of the success of any project is a high—quality installation.
  • We guarantee the perfect installation of any sliding partition.
  • The team of installers of our company has been trained for a long time at European manufacturing plants
  • The team of installers consists of a foreman and several workers.
  • The mobile team coordinates the installation date with you and proceeds to your facility in any city.
  • The installation team has been working fruitfully for more than 5 years. Our many years of experience as specialists allow us to solve even the most impossible tasks.
Process
06

Step Six

Warranty up to three years

  • Sliding structures of our company will last for decades without the slightest complaints, provided they are properly operated.
  • The 3—year warranty is another confirmation of quality and a sign of trust in our products.
  • Elements of sliding structures of partitions, walls, and doors do not require additional maintenance. Therefore, warranty cases are very rare for our company.
Process
whatsapp